Click here for the Washington State GC/CM Design Build Projects

See the bottom of the page for the WSDOT Design-Build Projects

 

GCCM Fire Station 8 Seismic Upgrade
Close Date: May 21st 2025, 3:00 PM PDT
The City of Vancouver is seeking proposals from highly qualified, prospective General Contractor/Construction Manager firms (GC/CM Firm or Contractor) to perform the Preconstruction Services and potential construction of the Fire Station 8 Seismic Upgrade located at 213 NE 120th Ave., Vancouver, WA 98684.
A Non-Mandatory Pre-Submittal Meeting/Site Visit will take place on Wednesday, April 30, 2025 at 10:00 am at 213 NE 120th Ave., Vancouver WA 98684. Attendance is not a pre-requisite for submitting a proposal. Comments by City Staff will be limited to a review of the project.
Contact Person: Anna Vogel anna.vogel@cityofvancouver.us 360-487-8429
Estimated Maximum Allowable Construction Cost: $ 7,200,000
Download & Follow Here: https://cityofvancouver.bonfirehub.com/opportunities/181565

———–

Progressive Design Build Services for So Interceptor Rehabilitation Project
Alternative Procurements KC001390
Closes 7/1/25 02.00.59 PM
The County intends to procure a design-build team to provide progressive design-build services for this Project. The Project generally includes rehabilitation of the South Interceptor to include reinforcement of both sewer pipe and rehabilitation of up to seven (7) maintenance holes. High-capacity temporary diversion pumping through temporary piping and odor control at each discharge location will be necessary to complete the work.
Download from King County Supplier Portal

———-

 

As of  5/19/25

Design-Build Projects – Advertisement Information:

Contract 9634 – I-5, E Fork Lewis River Bridge NB – Replace Bridge procurement dates to be determined 4/21/2025

Contract XE3518 – SR 18, Issaquah Hobart Rd to Deep Creek Vicinity – Widening & Fiber SOQ due 6/3/2025

Contract XE3431 – SR 167, I-5 to SR 161 – New Expressway Project Proposal submittal deadline 4/1/2025