Skip to content
Western Construction Resources Logo

WCR Plan Center
Western Construction Resources

  • Upcoming Prebid Meetings
  • About Us
    • Advertise With Us
    • Trial Membership
    • Pay Online
    • Plan Center
    • Pricing
    • Testimonials
  • Small Works Rosters
  • RFQs
    • Architects
    • Engineers
    • Annual
    • Design-Build
    • Other
  • Legal Notices – Upcoming Projects
  • Bidding
  • Resources
  • Contact Us
  • Blog
  • Upcoming Prebid Meetings
  • About Us
    • Advertise With Us
    • Trial Membership
    • Pay Online
    • Plan Center
    • Pricing
    • Testimonials
  • Small Works Rosters
  • RFQs
    • Architects
    • Engineers
    • Annual
    • Design-Build
    • Other
  • Legal Notices – Upcoming Projects
  • Bidding
  • Resources
  • Contact Us
  • Blog
Advertise With Us

Special Announcements

See the right column for upcoming closures

Come see your tax $$$ at work!

Make it a great day!

We offer FREE Notary Public services

 

Important Links

  • Member Login
  • My Plan Center
  • Construction Directory
  • Send Us Files

Hours

Monday – Friday 10am – 3pm

WCR will be closed, September 7th, for Labor Day!

Local Road Closures & Openings

Real-time travel information is available from the WSDOT mobile app or the WSDOT Travel Center Map

OVERSIZE LOADS: 

Oct 13: Westspan Hauling, Inc. is scheduled to move a manufactured home through South Whidbey Island, from SR 525 to 3692 Swede Hill Road, via S. Bayview Rd; Ewing Rd; Sills Rd; French Rd; and Scatchet Head Rd, between 12 noon and 1:00 pm on Tuesday,

LOCAL CLOSURES:

Oct 9: NB I-5 to Bellingham returns to usual alignment

October 10-11: Right Lane NB I-5 will close from Samish Way to Sunset Dr/SR542, 6am Saturday to 10am Sunday

October 11: SB I-5, Alger x240 – to install permanent pavement markings. Southbound I-5 also will be reduced to one lane as work near exit 240 continues on a project correcting 17 barriers to fish migration near Lake Samish.

October 12: Collins Road (County Road # 63310) at Rail Grade Crossing will be closed and such closure shall continue thereafter unless and until further ordered by the Board. Additional information may be obtained from Given Kutz, Traffic Engineering, 360-416-1400 is the contact person for this issue.

Thru Oct 17: Concrete Sauk Valley Road #08000 at milepost 13.3 – The roadway will be closed for approximately eighty (80) calendar days to allow work to be completed on the South Osterman Creek Culvert Repair Project No. EO214-5.

Thru Oct 23: South Skagit Highway #07000 from MP 5.3 to MP 5.4 closed to all through traffic including emergency vehicles. The roadway will be closed for approximately sixty (60) calendar days to allow work to be completed on the Stevens Creek Fish Passage Improvement Project #ES07000-15

Until Early 2027: the State Route 536 Skagit River Bridge/Division Street Bridge will close to eastbound traffic through the duration of a project to repaint the historic bridge. All passenger and freight vehicles need to follow the detour until the project finishes in early 2027

Until July 2027: Year-long SR 20 roundabout project south of Anacortes begins work 19 days of single-lane traffic coming to project area in mid-August. Preliminary work is now underway on an intersection improvement project to enhance safety along State Route 20 by building a new roundabout at Campbell Lake Road. Most construction for the new roundabout south of Anacortes will be complete in July 2027, weather permitting.

OPENINGS:

Oct 9: NB I-5 to Bellingham returns to usual alignment

Testimonials

I find the service of WCR invaluable. All our commercial work is reviewed through WCR. Having WCR available to me, has saved my company from having to hire an estimator. I do most of my work through Dawn, I find her work exemplary. The plans are put into very neat packages for customers so we can be as efficient as possible. She does this with one of the best attitudes of any one I know. By helping my company save time and money, I am able to hire more employees which helps me and my community. Thank you Dawn and Thank you WCR.
Simon ReardonSR Concrete Construction
Thank you Dawn, I appreciate your level of customer service.? It is refreshing to find that in the workplace these days.? And thank you always for your cheerful attitude.? It even comes through on the faxes with your personal touch with little messages to us.
Pat SchoutenColacurcio Brothers Inc
Thanks very much for your help with this project. You are great!
Susie LandsemDouglas Landsem Architect AIABellingham
WCR is a wonderful company to do business with. Dawn Harju, President, is so helpful in every way. We have enjoyed working with her and her staff.
Ron & Donna Carlson
WCR offers valuable services and it’s owner, Dawn Harju is one of the most wonderful people I have met. She is truly dedicated to helping people anyway she can and cares greatly that WCR provides the best service and results possible. You will be extremely well taken care of and find great value in what WCR has to offer.
Tom WanneFibberreedBellingham
I have been a member of the plan center since its beginnings. Since you have become the owner, the center has new life in it. Your professional and human interaction with me, as with all of the members, is just great. You are always considering new ideas to improve your service to everybody. Because of your hard work and sprit, the business will continue to attract new members. Again Dawn, thanks so much.
Neil HolmesHolmes Enterprises Painting

Sign up for the WCR Newsletter

Like and Follow WCR

Local Resources

© WCR Publications, Inc. All Rights Reserved
Page load link
Go to Top