Location: Bellingham

Engineer’s Estimate: $2,081,785.00

Awarded to: Faber Construction – $1,778,640.43

Generals Bidding: 13

Project Description: Project includes installing storm water treatment facilities including bioretention cells and modular wetland system vaults. This project also includes performing spot repairs and trenchless relining of existing storm mains. Storm drain laterals will also be replaced including intersection reconstruction and required accessibility upgrades.

Read More Here: https://www.cob.org/gov/projects/Pages/Public%20Works/columbia-stormwater-retrofit-ev-0120.aspx